Previous Projects

Role: Research Assistant
Institute: Department of Biochemistry and Molecular Biology, SUST
Duration: April 2021 – January 2023
-
This project focused on mutation profiling and immune landscape mapping of SARS-CoV-2 variants, including Delta and Omicron. Using a dataset of over 200,000 GISAID sequences, I applied tools like NextClade, PredictSNP, and DynaMut to identify deleterious mutations in the spike protein, including those associated with immune escape and protein destabilization.
-
Machine learning models were trained to classify high-risk mutations, integrating immunoinformatics tools (IEDB, NetCTLpan) to assess T-cell and B-cell epitope variability. This resulted in several impactful publications:
-
Scientific Reports (2023): Analysis of shared mutations across deceased patients globally
-
Frontiers in Pharmacology (2023): Variant-specific mutation mapping for vaccine strategy
-
Advances in Biomarker Sciences and Technology (2023): Multi-omics biomarker analysis in cancer–diabetes overlap
-
Frontiers in Immunology (2022): Natural immune enhancers during COVID-19
-
I performed data preprocessing, statistical modeling in R and SPSS, and manuscript figures using Adobe Illustrator.
.jpg)
Role: Research Assistant
Institute: Department of Civil & Environmental Engineering, SUST and COVID-19 Testing Lab at NSTU
Duration: November 2020 – June 2021
-
This interdisciplinary project applied environmental sampling and molecular diagnostics to detect SARS-CoV-2 RNA in wastewater from communities with limited sanitation infrastructure. As part of the project:
-
I collected and processed wastewater samples.
-
Extracted RNA and performed qRT-PCR.
-
Developed a monitoring framework using R for spatial and temporal trends.
-
This work led to the following publications:
-
Environmental Pollution (2022): Surveillance protocol for low-resource settings
-
Current Opinion in Environmental Science & Health (2023): Integration of wastewater data with clinical diagnostics
-
medRxiv (2021): Pilot studies on decentralized wastewater monitoring
-
These efforts contributed directly to early warning models for COVID-19 outbreaks and showcased my ability to work across microbiology, public health, and data science domains.

Role: Research Assistant (Remote)
Institute: Red-Green Research Center
Duration: February 2020 – December 2021
-
Using structure-based drug discovery techniques, this project aimed to design small molecules and RNA aptamers that could bind to the SARS-CoV-2 receptor-binding domain (RBD) with high affinity. I used YASARA, GROMACS, and Desmond for MD simulations and docking validation.
-
Curated ligand libraries.
-
Modeled RBD-ligand interactions.
-
Ran Linux-based simulation pipelines for conformational stability.

Role: Research Assistant
Institute: Department of Civil & Environmental Engineering, SUST
Duration: November 2020 – March 2021
-
In this project, I cultivated blue-green algae (Microcoleus sp.) for use in biosorptive removal of heavy metals from industrial wastewater. I optimized culture conditions and conducted batch absorption assays under varying pH and retention times.
-
Analytical methods such as AAS and spectrophotometry were employed to calculate removal efficiencies. Data was modeled using Freundlich and Langmuir isotherms. This work contributed to:
-
AQUA – Water Infrastructure, Ecosystems and Society (2023): Novel application of Microcoleus in bioremediation
